Project
Design and construction of a FOCL and automation and telemechanics system for the Amangeldy – CS-5 Taraz gas pipeline of KazTransGas OJSC
Year: 2003. Length: 192 km.
- Year
- 2003
- Length
- 192 km
Design and construction of a FOCL and automation and telemechanics system for the Amangeldy – CS-5 Taraz gas pipeline of KazTransGas OJSC
